Meta tags:
description= Seamlessly unite the conveniences of a prefabhome and the captivating visual delight that only true masters of design can create.;
Headings (most frequently used words):
the, revolution, to, home, will, homes, how, are, what, in, do, is, and, building, my, can, long, de, portzamparc, eduardo, calma, campana, brothers, elizabeth, ben, van, berkel, gluckman, tang, marco, brambilla, we, much, included, package, documents, me, start, process, need, you, built, with, be, delivered, it, take, install, precrafted, world, design, pelli, architects, faqs, contact, answering, your, questions, pavilions, modular, hotels, furnitures, pop, ups, glampings, skin, fdmd, discover, see, more, different, does, each, cost, reservation, fee, provide, am, ready, that, require, from, else, prepare, prior, construction, when, code, permit, assist, securing, permits, deliver, anywhere, kind, of, foundation, should, used, make, alterations, plans, last, against, hurricanes, earthquakes, roofing, system, support, snow, load, temperate, countries, fabrication, all, at, once, ship, who, shipping, costs, come, warranty, quick, links, zaha, hadid, ron, arrad, kravitz, kengo, kuma, paulo, mendez, da, rocha, oswald, boateng, tom, dixon, sou, fujimoto, kenneth, cobonpue, fernando, romero, massimiliano, doriana, fuksas, tange, associates, wallpaper, anthony, nazareno, michael, maltzan, christian, francesco, clemente, clarke, selgas, cano, kulapat, yantrasast, daphne, guinness, amar, stoudemire, budji, royal, architecture, avaf, chad, oppenheim, francesca, versace, misha, kahn, carlos, zapata, studio, ronald, ventura, preeminent, artists, designers, therevolutionaries, collections, get, touch,
Text of the page (most frequently used words):
the (291), and (144), #revolution (88), home (82), are (66), will (60), homes (58), with (40), all (39), that (39), client (36), design (34), more (33), site (30), can (30), for (29), view (27), your (25), installation (24), designed (24), from (24), structural (21), warranty (21), may (21), how (21), plans (21), building (21), delivered (20), must (18), what (18), map (18), but (17), local (15), fabrication (15), they (15), space (15), precrafted (14), process (14), materials (12), shipping (12), included (12), cost (12), prior (12), contractor (12), depending (12), adapt (12), different (12), built (12), necessary (12), while (12), crafted (12), refit (12), standard (11), prefabricated (11), each (11), every (11), start (11), contact (10), any (10), you (10), our (10), provides (10), other (10), high (10), faqs (9), material (9), after (9), subject (9), package (9), shall (9), day (9), pre (9), orientation (9), takes (9), days (9), varies (9), long (9), used (9), upon (9), permits (9), codes (9), there (9), have (9), provide (9), mechanical (9), electrical (9), sanitary (9), permit (9), need (9), technical (9), structures (9), data (9), plumbing (9), pavilions (9), spaces (9), whether (9), living (9), where (8), architecture (8), right (8), portzamparc (8), collections (7), revolutionaries (7), details (7), conditions (7), who (7), world (7), project (7), which (7), exclusive (7), send (6), message (6), number (6), five (6), year (6), turnover (6), covers (6), unaltered (6), expected (6), natural (6), finishes (6), come (6), handling (6), costs (6), not (6), hire (6), his (6), two (6), period (6), install (6), minimum (6), this (6), specific (6), take (6), vary (6), location (6), once (6), size (6), approval (6), roofing (6), systems (6), last (6), alteration (6), designs (6), void (6), soil (6), type (6), substructure (6), existing (6), foundation (6), should (6), since (6), climate (6), architectural (6), these (6), when (6), secured (6), general (6), additions (6), code (6), documentation (6), preparation (6), completed (6), tests (6), detailed (6), development (6), following (6), target (6), water (6), level (6), documents (6), including (6), non (6), fixtures (6), fee (6), much (6), architects (6), efficient (6), questions (6), one (6), having (6), enhances (6), quality (6), creating (6), bring (6), character (6), enhance (6), ensuring (6), new (6), art (6), now (6), pieces (6), special (6), pavilion (6), also (6), just (6), something (6), marco (6), brambilla (6), gluckman (6), tang (6), ben (6), van (6), berkel (6), elizabeth (6), campana (6), brothers (6), eduardo (6), calma (6), create (5), designers (5), desires (5), own (5), dreams (5), most (5), don (5), even (5), know (5), concept (5), offers (5), solution (5), greatly (5), simplifying (5), picking (5), selection (5), doorstep (5), however (5), monotony (5), uninspiring (5), skin (5), daphne (5), email (4), name (4), team (4), below (4), get (4), touch (4), only (4), system (4), make (4), out (4), towards (4), artists (4), series (4), leading (4), its (4), lighting (4), style (4), unique (4), open (4), services (4), pelli (4), 2025 (3), rights (3), reserved (3), quick (3), links (3), phone (3), three (3), accredited (3), logistics (3), provider (3), facilitate (3), paid (3), stage (3), her (3), installer (3), representative (3), present (3), during (3), entire (3), 1st (3), 2nd (3), methodology (3), approximately (3), factors (3), affect (3), usually (3), factory (3), being (3), manufactured (3), ship (3), containers (3), based (3), generally (3), 40ft (3), container (3), truck (3), calendar (3), begins (3), climates (3), support (3), snow (3), load (3), temperate (3), countries (3), comply (3), international (3), against (3), hurricanes (3), earthquakes (3), changes (3), deemed (3), applied (3), specified (3), product (3), alterations (3), actual (3), recommended (3), properties (3), philippines (3), inc (3), kind (3), yes (3), shipped (3), worldwide (3), around (3), globe (3), line (3), climatic (3), condition (3), deliver (3), anywhere (3), set (3), specifications (3), applying (3), reproduced (3), written (3), consent (3), assist (3), securing (3), delivery (3), meet (3), region (3), information (3), revisions (3), architecturally (3), structurally (3), mechanically (3), electrically (3), engineered (3), commence (3), pay (3), required (3), downpayment (3), conducted (3), simultaneously (3), waiting (3), groundwork (3), excavation (3), prepared (3), carried (3), gantt (3), chart (3), submitted (3), ensure (3), has (3), been (3), else (3), prepare (3), construction (3), placing (3), order (3), submit (3), requirements (3), vicinity (3), locale (3), topography (3), flood (3), elevation (3), ordinances (3), apply (3), boring (3), test (3), ground (3), table (3), rainfall (3), maximum (3), wind (3), velocity (3), ready (3), require (3), packages (3), base (3), plan (3), help (3), assessment (3), fitted (3), moving (3), components (3), hvac (3), plus (3), inclusions (3), items (3), listed (3), specification (3), sheet (3), refundable (3), retail (3), price (3), credited (3), down (3), payment (3), reservation (3), per (3), does (3), collection (3), limited (3), edition (3), unites (3), preeminent (3), livable (3), network (3), cutting (3), edge (3), technologies (3), production (3), democratizing (3), introducing (3), collaboration (3), industry (3), creatives (3), got (3), enquiry (3), answering (3), discover (3), see (3), fdmd (3), house (3), guinness (3), driveways (3), patios (3), fencing (3), brickwork (3), exterior (3), durable (3), craftsmanship (3), improving (3), curb (3), appeal (3), beautiful (3), outdoor (3), ensures (3), detail (3), impress (3), glampings (3), back (3), life (3), expert (3), restoration (3), features (3), repairs (3), full (3), scale (3), renovation (3), preserve (3), original (3), modern (3), durability (3), perfect (3), balance (3), between (3), heritage (3), contemporary (3), pop (3), ups (3), expand (3), seamless (3), extension (3), bigger (3), kitchen (3), area (3), multi (3), purpose (3), expertly (3), extensions (3), flow (3), value (3), usability (3), maintaining (3), furnitures (3), luxurious (3), suites (3), practical (3), family (3), bathrooms (3), delivers (3), beautifully (3), combine (3), functionality (3), handle (3), everything (3), tiling (3), finish (3), both (3), comfort (3), aesthetics (3), modular (3), hotels (3), collectors (3), insatiable (3), thirst (3), ways (3), experiencing (3), collect (3), them (3), into (3), their (3), backyards (3), collectible (3), whose (3), wide (3), variety (3), functions (3), complement (3), anything (3), dining (3), pool (3), utilized (3), everyday (3), activities (3), marvelled (3), seek (3), want (3), carefully (3), fabricated (3), inquire (3), website (2), century (2), fashion (2), ronald (2), ventura (2), carlos (2), zapata (2), studio (2), misha (2), kahn (2), francesca (2), versace (2), chad (2), oppenheim (2), avaf (2), budji (2), royal (2), amar (2), stoudemire (2), kulapat (2), yantrasast (2), selgas (2), cano (2), clarke (2), francesco (2), clemente (2), christian (2), michael (2), maltzan (2), anthony (2), nazareno (2), wallpaper (2), tange (2), associates (2), massimiliano (2), doriana (2), fuksas (2), fernando (2), romero (2), kenneth (2), cobonpue (2), sou (2), fujimoto (2), tom (2), dixon (2), oswald (2), boateng (2), paulo (2), mendez (2), rocha (2), kengo (2), kuma (2), kravitz (2), ron (2), arrad (2), zaha (2), hadid (2), free, framer, builder, loved, startups, agencies, follow, 927, 793, 1404, telephone, info, revolutionprecrafted, com, w1w, 5pf, 167, 169, great, portland, street, 23f, diamond, tower, city, makati, office, inquiries, explore, vision, further, invite, professional, using, provided, fourdirectionsmodulediagonal, gets, stacking, tubes, perpendicular, top, forming, story, element, thus, facade, cardinal, direction, north, east, south, west, ideal, reflects, well, renowned, designer, artist, theater, enthusiast, work, evokes, drama, sophistication, façade, composed, fixed, collapsible, metal, panels, front, doors, windows, giving, facets, closed, façades, find, fit, needs, group, collectively, pursue, desire, attainable, everyone, seamlessly, unite, conveniences, prefabhome, captivating, visual, delight, true, masters,
Text of the page (random words):
home concept offers a solution by greatly simplifying the process picking a home design from a selection and having it delivered right to your doorstep however the monotony of standard design can be uninspiring view more discover and see more precrafted homes view more discover and see more precrafted homes every one of us desires to own the home of our dreams but most of us don t even know where to start the prefabricated home concept offers a solution by greatly simplifying the process picking a home design from a selection and having it delivered right to your doorstep however the monotony of standard design can be uninspiring view more faqs faqs faqs answering your questions answering your questions answering your questions got more questions send us your enquiry below got more questions send us your enquiry below got more questions send us your enquiry below get in touch get in touch get in touch how are revolution homes different revolution is a collection of limited edition pre crafted structures including homes and pavilions the project unites 48 of the world s preeminent architects artists and designers to create an exclusive series of prefabricated livable spaces with a network of cutting edge technologies and cost efficient production systems revolution is democratizing high design and architecture by introducing designed spaces in exclusive collaboration with industry leading creatives how much does each revolution home cost cost varies per revolution home how much is the reservation fee there is a non refundable fee of 10 of the retail price which will be credited towards the 50 down payment what is included in the revolution package the homes are fitted with all non moving components from structural electrical plumbing mechanical hvac plus all other fixtures and finishes alteration of the inclusions will void the warranty for materials all items listed in the specification sheet will be included in the home what documents will revolution provide to me all packages come with the standard documentation including the following a detailed design plans 1 architectural 2 structural 3 electrical 4 plumbing sanitary 5 mechanical b site development base plan c other technical details that will help the client on his assessment i am ready to start the process what are the documents that revolution will require from me upon placing the order the client must submit the following requirements a location map vicinity map b site map of target locale c site topography map d flood water level elevation map e climate map f local codes and ordinances that may apply to the structures g technical tests and data of the target site 1 boring test 2 ground water table level 3 rainfall data 4 maximum wind velocity data what else do i need to prepare prior to construction the client shall hire a local general contractor prior to site preparation and installation all technical tests and substructure groundwork excavation and foundation shall be prepared and carried out by the contractor a detailed project gantt chart must be submitted to revolution to ensure that the homes are delivered after the site development has been completed when will you start building my home fabrication of the home will commence after the client provides all necessary documentation and pay the required downpayment of 50 site preparation may be conducted simultaneously by the client while waiting for the fabrication to be completed are revolution homes built to code revolution homes are designed to meet local building codes for each and every region they are built for the client must provide all information necessary should there be any revisions additions to the design to adapt it with the local code all of revolution s plans are architecturally structurally mechanically sanitary and electrically engineered do i need a building permit building permit s must be secured by the client or general contractor all necessary permits must be secured prior to the delivery and installation of the homes can revolution assist with securing building permits revolution will provide the client 1 set of plans architectural mechanical electrical sanitary structural and specifications these plans can be used by the client when applying for a building permit these plans may be reproduced with the written consent of revolution precrafted can you deliver a home anywhere in the world yes revolution homes are designed to be shipped worldwide since it is prefabricated but since we have different climate around the globe we have specific line up that will adapt on each climatic condition what kind of foundation should be used depending on the soil type of the actual site there are different substructure designs that will be recommended by revolution precrafted properties philippines inc that can adapt on the existing soil type can i make alterations to the plans changes deemed necessary by the client may be applied upon turnover of the home but are subject to the approval of revolution any alteration of the designs or the materials specified by revolution will void the product warranty are revolution homes built to last against hurricanes and earthquakes revolution homes are designed to comply with international building codes will the roofing system support the snow load in temperate countries revolution homes roofing systems are designed to adapt to different climates how long is the fabrication process fabrication takes a minimum of 90 calendar days and begins upon the approval of the fabrication plans and permits how will my home be delivered revolution homes are generally delivered in a standard 20 40ft container truck this varies depending on the size of the home and the materials used is my home delivered all at once the home will be delivered all at once the number of containers may vary based on the size of the revolution home how long will it take to ship a home shipping usually takes 30 45 days but it may vary depending on the location of the site and the factory where it is being manufactured how long will it take to install installation takes approximately five 5 days at the minimum this varies depending on the design of the home and other site specific factors that may affect the installation process who will install the home prior to the installation stage the client must hire his her local installer contractor a revolution representative will be present for the two day pre installation orientation and during the entire installation period 1st day design and material orientation 2nd day methodology and installation orientation are shipping costs included in the package an accredited logistics provider will facilitate the shipping and handling of the homes shipping and handling costs are not included in the package cost and shall be paid for by the client do the homes come with a warranty revolution provides a five 5 year structural warranty and three 3 year material warranty after turnover structural warranty only covers the unaltered structural design and is subject to expected natural conditions material warranty covers the unaltered finishes and or materials and is subject to expected natural conditions how are revolution homes different revolution is a collection of limited edition pre crafted structures including homes and pavilions the project unites 48 of the world s preeminent architects artists and designers to create an exclusive series of prefabricated livable spaces with a network of cutting edge technologies and cost efficient production systems revolution is democratizing high design and architecture by introducing designed spaces in exclusive collaboration with industry leading creatives how much does each revolution home cost cost varies per revolution home how much is the reservation fee there is a non refundable fee of 10 of the retail price which will be credited towards the 50 down payment what is included in the revolution package the homes are fitted with all non moving components from structural electrical plumbing mechanical hvac plus all other fixtures and finishes alteration of the inclusions will void the warranty for materials all items listed in the specification sheet will be included in the home what documents will revolution provide to me all packages come with the standard documentation including the following a detailed design plans 1 architectural 2 structural 3 electrical 4 plumbing sanitary 5 mechanical b site development base plan c other technical details that will help the client on his assessment i am ready to start the process what are the documents that revolution will require from me upon placing the order the client must submit the following requirements a location map vicinity map b site map of target locale c site topography map d flood water level elevation map e climate map f local codes and ordinances that may apply to the structures g technical tests and data of the target site 1 boring test 2 ground water table level 3 rainfall data 4 maximum wind velocity data what else do i need to prepare prior to construction the client shall hire a local general contractor prior to site preparation and installation all technical tests and substructure groundwork excavation and foundation shall be prepared and carried out by the contractor a detailed project gantt chart must be submitted to revolution to ensure that the homes are delivered after the site development has been completed when will you start building my home fabrication of the home will commence after the client provides all necessary documentation and pay the required downpayment of 50 site preparation may be conducted simultaneously by the client while waiting for the fabrication to be completed are revolution homes built to code revolution homes are designed to meet local building codes for each and every region they are built for the client must provide all information necessary should there be any revisions additions to the design to adapt it with the local code all of revolution s plans are architecturally structurally mechanically sanitary and electrically engineered do i need a building permit building permit s must be secured by the client or general contractor all necessary permits must be secured prior to the delivery and installation of the homes can revolution assist with securing building permits revolution will provide the client 1 set of plans architectural mechanical electrical sanitary structural and specifications these plans can be used by the client when applying for a building permit these plans may be reproduced with the written consent of revolution precrafted can you deliver a home anywhere in the world yes revolution homes are designed to be shipped worldwide since it is prefabricated but since we have different climate around the globe we have specific line up that will adapt on each climatic condition what kind of foundation should be used depending on the soil type of the actual site there are different substructure designs that will be recommended by revolution precrafted properties philippines inc that can adapt on the existing soil type can i make alterations to the plans changes deemed necessary by the client may be applied upon turnover of the home but are subject to the approval of revolution any alteration of the designs or the materials specified by revolution will void the product warranty are revolution homes built to last against hurricanes and earthquakes revolution homes are designed to comply with international building codes will the roofing system support the snow load in temperate countries revolution homes roofing systems are designed to adapt to different climates how long is the fabrication process fabrication takes a minimum of 90 calendar days and begins upon the approval of the fabrication plans and permits how will my home be delivered revolution homes are generally delivered in a standard 20 40ft container truck this varies depending on the size of the home and the materials used is my home delivered all at once the home will be delivered all at once the number of containers may vary based on the size of the revolution home how long will it take to ship a home shipping usually takes 30 45 days but it may vary depending on the location of the site and the factory where it is being manufactured how long will it take to install installation takes approximately five 5 days at the minimum this varies depending on the design of the home and other site specific factors that may affect the installation process who will install the home prior to the installation stage the client must hire his her local installer contractor a revolution representative will be present for the two day pre installation orientation and during the entire installation period 1st day design and material orientation 2nd day methodology and installation orientation are shipping costs included in the package an accredited logistics provider will facilitate the shipping and handling of the homes shipping and handling costs are not included in the package cost and shall be paid for by the client do the homes come with a warranty revolution provides a five 5 year structural warranty and three 3 year material warranty after turnover structural warranty only covers the unaltered structural design and is subject to expected natural conditions material warranty covers the unaltered finishes and or materials and is subject to expected natural conditions how are revolution homes different revolution is a collection of limited edition pre crafted structures including homes and pavilions the project unites 48 of the world s preeminent architects artists and designers to create an exclusive series of prefabricated livable spaces with a network of cutting edge technologies and cost efficient production systems revolution is democratizing high design and architecture by introducing designed spaces in exclusive collaboration with industry leading creatives how much does each revolution home cost cost varies per revolution home how much is the reservation fee there is a non refundable fee of 10 of the retail price which will be credited towards the 50 down payment what is included in the revolution package the homes are fitted with all non moving components from structural electrical plumbing mechanical hvac plus all other fixtures and finishes alteration of the inclusions will void the warranty for materials all items listed in the specification sheet will be included in the home what documents will revolution provide to me all packages come with the standard documentation including the following a detailed design plans 1 architectural 2 structural 3 electrical 4 plumbing sanitary 5 mechanical b site development base plan c other technical details that will help the client on his assessment i am ready to start the process what are the documents that revolution will require from me upon placing the order the client must submit the following requirements a ...
|