Meta tags:
description= BoxPower designs, deploys, and operates distributed infrastructure at the grid-edge.;
Headings (most frequently used words):
the, grid, to, we, solve, more, your, and, unlocking, edge, problems, design, deploy, operate, work, with, organizations, closest, providing, faster, affordable, reliable, alternatives, energy, infrastructure, featured, projects, ready, constraint, andalusia, bridging, years, power, california, tribe, flexible, interconnection, compliance, tribal, utility, distributed, capacity, demand, response, pg, remote, wildfire, mitigation, program, mchc, hillside, critical, backup, looking, for, partner, on, next, project,
Text of the page (most frequently used words):
and (26), the (23), more (19), grid (15), with (13), power (11), #interconnection (11), boxpower (11), learn (10), capacity (9), for (9), years (9), infrastructure (8), #utility (8), epc (7), services (7), easi (7), critical (6), tribal (6), remote (6), system (6), fleet (6), work (5), distributed (5), flexible (5), kits (5), read (5), explore (5), utilities (4), backup (4), resilience (4), bridging (4), use (4), hardware (4), project (4), projects (4), across (4), our (4), systems (4), wires (4), waiting (4), about (3), government (3), developer (3), partners (3), nations (3), who (3), cases (3), controller (3), platform (3), partner (3), owned (3), upgrade (3), faster (3), than (3), uptime (3), managed (3), operation (3), reliable (3), operations (3), without (3), get (3), long (3), operating (3), operate (3), connection (3), that (3), can (3), build (3), blog (2), careers (2), team (2), your (2), start (2), solve (2), saves (2), over (2), year (2), revenue (2), solar (2), battery (2), per (2), program (2), turnkey (2), wildfire (2), energy (2), demand (2), response (2), tribe (2), development (2), five (2), only (2), home (2), through (2), queue (2), traditional (2), bess (2), renewable (2), microgrids (2), largest (2), permanent (2), delivering (2), from (2), grade (2), load (2), pre (2), engineered (2), proven (2), constrained (2), design (2), field (2), deploy (2), keeps (2), backed (2), out (2), sites (2), edge (2), high (2), risk (2), distribution (2), lines (2), cost (2), hardening (2), line (2), doesn (2), reach (2), upgrades (2), too (2), full (2), now (2), limits (2), deliver (2), you (2), feeder (2), where (2), started (2), contact, company, 12438, loma, rica, drive, ste, grass, valley, 95945, info, looking, next, book, minute, review, ready, constraint, clinic, 85k, costs, avoids, lost, spoiled, medications, microgrid, mchc, hillside, undergrounding, their, utilizing, standardized, mitigation, storage, defers, earns, arizona, powering, housing, firm, california, compliance, large, luxury, served, three, andalusia, view, featured, average, saved, generation, providing, affordable, alternatives, stats, trusted, sovereign, communities, underserves, ensure, continuity, secure, always, electrify, protect, depending, availability, powered, expand, accelerate, connections, affordably, organizations, closest, monitoring, proactive, term, asset, management, engineering, procurement, construction, single, vertically, integrated, visibility, dispatchability, security, one, box, designed, comply, dynamic, envelope, requirements, curtailment, parameters, feoc, compliant, modular, deployments, hardest, off, environments, site, inputs, fully, specified, deployable, customers, online, psps, epss, driven, outages, lasting, days, going, lands, rural, industrial, need, primary, has, been, decade, replacing, standalone, often, fraction, place, take, much, deploys, dispatchable, node, defer, replace, those, room, feeders, are, enables, under, instead, comes, conditions, solutions, developers, face, waits, kill, delay, growth, provides, path, connect, later, fast, enough, keeping, existing, safe, gets, expensive, whether, hitting, delivers, closes, gap, factory, tested, problems, keep, reliability, data, prove, add, less, extension, substation, non, alternative, months, takes, speed, see, provide, software, plans, them, unlocking, investors, terms, privacy, policy, case, studies, resources,
Text of the page (random words):
utility grade distribution infrastructure platform boxpower home platform easi hardware kits controller epc services o m services use cases remote power backup resilience bridging distributed capacity flexible interconnection who we work with utilities c i government and critical infrastructure developer epc partners tribal nations resources case studies blog about about boxpower team careers partner with us privacy policy terms of use investors get started get started unlocking the grid edge we build and operate the largest fleet of utility owned bess renewable microgrids in the us and provide the software that plans them we deliver power faster than the grid can build it start with easi see our work speed to power deploy in months where interconnection takes years non wires alternative add capacity for less than a line extension substation build or feeder upgrade resilience you can prove keep the power on backed by 16 system years of 99 99 reliability data boxpower use cases the problems we solve the grid can t deliver capacity fast enough and keeping existing infrastructure safe only gets more expensive whether you re waiting years for interconnection hitting feeder limits operating where the grid doesn t reach or hardening high risk lines boxpower delivers the infrastructure that closes the gap pre engineered factory tested and field proven the connection queue is years long utilities and developers face interconnection waits that kill projects and delay load growth boxpower provides a path to operate now and connect later explore bridging solutions connection comes with conditions feeders are full boxpower enables connection now under operating limits instead of waiting for a full upgrade explore flexible interconnection the grid is out of room traditional wires upgrades take too long and cost too much boxpower deploys dispatchable capacity at the constrained node to defer or replace those upgrades explore distributed capacity the grid doesn t reach remote sites tribal lands rural infrastructure edge of grid industrial sites need permanent reliable primary power boxpower has been delivering it for a decade replacing high risk distribution lines with standalone systems often at a fraction of the cost of hardening the line in place explore remote power the power keeps going out boxpower keeps critical customers online through psps epss and wildfire driven outages lasting days backed by 99 99 uptime across our managed fleet 9 systems 16 system years of operation explore backup resilience design deploy operate easi design with easi from site inputs to a fully specified field deployable boxpower system learn more hardware kits pre engineered feoc compliant modular kits proven across 50 deployments in the hardest off grid and constrained grid environments learn more controller utility grade visibility dispatchability and security in one box designed to comply with utility dynamic operating envelope requirements and load curtailment parameters for flexible interconnection learn more epc services turnkey engineering procurement and construction from a single vertically integrated partner learn more o m services fleet monitoring proactive operations and long term asset management delivering 99 99 uptime across our managed fleet 9 systems 16 system years of operation learn more who we work with we work with the organizations closest to the grid utilities expand capacity and accelerate connections affordably without waiting on wires learn more developer epc partners get projects powered without waiting for interconnection learn more c i electrify and protect operations without depending on grid availability learn more government and critical infrastructure ensure continuity of critical operations with secure always on distributed power learn more tribal nations reliable sovereign permanent power for communities the grid underserves learn more trusted by stats providing faster more affordable more reliable alternatives to energy infrastructure largest fleet utility owned bess renewable generation microgrids in the us 5m average saved per project vs traditional wires 99 99 uptime across our managed fleet 9 systems 16 system years of operation featured projects view more projects andalusia bridging years to power large luxury home development served through a three to five year interconnection queue read more california tribe flexible interconnection compliance powering a tribal housing development five years faster than firm only interconnection read more tribal utility distributed capacity and demand response utility owned solar battery energy storage system defers capacity upgrade and earns demand response revenue for an arizona tribe read more pg e remote grid and wildfire mitigation program pg e saves over 5m per project vs undergrounding in their remote grid program by utilizing easi standardized hardware kits and turnkey epc and o m services read more mchc hillside critical backup clinic saves over 85k year in utility costs and avoids lost revenue and spoiled medications with a solar battery microgrid read more ready to solve your grid constraint start with easi book a 30 minute project review looking for a partner on your next project info boxpower io 12438 loma rica drive ste c grass valley ca 95945 platform easi hardware kits controller epc services o m services use cases flexible interconnection distributed capacity bridging backup resilience remote power who we work with tribal nations developer epc partners government and critical infrastructure c i utilities company about team careers contact blog
|