If you are not sure if the website you would like to visit is secure, you can verify it here. Enter the website address of the page and see parts of its content and the thumbnail images on this site. None (if any) dangerous scripts on the referenced page will be executed. Additionally, if the selected site contains subpages, you can verify it (review) in batches containing 5 pages.
favicon.ico: opa911.blogspot.com - OPA 911.

site address: opa911.blogspot.com

site title: OPA 911

Our opinion (on Saturday 08 August 2026 6:51:18 UTC):

GREEN status (no comments) - no comments

Meta tags:

Headings (most frequently used words):

2011, monday, april, 11, thursday, 21, march, the, and, in, progress, opa, 911, friday, november, 18, 31, february, 28, other, stuff, contributors, blog, archive, followers, day, before, move, think, adding, color, evidence, hostages, theodorakis, building, inside, out, closets, doors, countertops, wood, floors, sianna, choice, pink,

Text of the page (most frequently used words):
the (264), and (105), that (52), but (35), for (33), will (31), share (30), not (29), they (29), this (28), are (27), with (24), have (22), you (20), was (19), house (17), out (17), were (15), some (15), see (14), room (14), now (14), one (13), there (13), all (13), can (13), get (13), jenn (12), had (12), posted (11), color (10), pinterest (10), facebook (10), blogthis (10), email (10), comments (10), time (10), like (10), really (10), back (10), then (10), sink (10), could (10), what (10), move (9), space (9), after (9), our (9), from (9), below (9), done (9), same (9), been (9), here (9), day (8), think (8), 2011 (8), only (8), sianna (8), just (8), has (8), actually (8), work (8), alex (8), tile (8), when (7), kitchen (7), bit (7), wood (7), shot (7), olivia (7), doors (7), even (7), still (7), november (6), before (6), since (6), more (6), don (6), week (6), last (6), door (6), white (6), point (6), into (6), march (5), april (5), paint (5), plaster (5), know (5), look (5), being (5), light (5), looks (5), counter (5), faster (5), first (5), carpenter (5), photo (5), need (5), around (5), came (5), find (5), closet (5), them (5), though (5), also (5), faucet (5), october (4), bath (4), guy (4), who (4), outside (4), decided (4), walls (4), none (4), end (4), how (4), monday (4), took (4), over (4), got (4), finished (4), days (4), bedroom (4), today (4), next (4), painter (4), want (4), least (4), great (4), slowly (4), those (4), painted (4), very (4), apparently (4), best (4), good (4), bathroom (4), correct (4), background (4), february (3), other (3), colored (3), downstairs (3), left (3), wanted (3), pink (3), which (3), come (3), faucets (3), wall (3), finally (3), heating (3), change (3), start (3), take (3), put (3), guys (3), would (3), turned (3), master (3), loft (3), two (3), able (3), rooms (3), her (3), yellowish (3), tops (3), show (3), construction (3), together (3), getting (3), splash (3), handles (3), thought (3), better (3), gone (3), lot (3), going (3), floor (3), closets (3), installed (3), storage (3), did (3), things (3), girls (3), exposed (3), tone (3), each (3), where (3), cleaning (3), workers (3), part (3), much (3), their (3), goes (3), painters (3), photos (3), vanity (3), way (3), yes (3), working (3), hostage (3), ordered (3), every (3), single (3), gets (3), moz (3), initial (3), ended (3), went (3), january (2), july (2), september (2), may (2), adding (2), blog (2), stuff (2), posts (2), home (2), decision (2), opted (2), old (2), character (2), main (2), reason (2), actual (2), well (2), small (2), window (2), crappy (2), holding (2), told (2), range (2), let (2), process (2), should (2), surprised (2), village (2), depth (2), changes (2), pretty (2), darker (2), nice (2), plumber (2), finishing (2), top (2), leave (2), changed (2), about (2), while (2), warm (2), flooring (2), clean (2), down (2), floors (2), baseboard (2), towards (2), taken (2), under (2), coat (2), mix (2), match (2), happens (2), dust (2), once (2), cleaned (2), frames (2), something (2), seem (2), thing (2), table (2), made (2), additional (2), front (2), finish (2), order (2), hood (2), shop (2), interior (2), placed (2), off (2), right (2), entire (2), place (2), between (2), progress (2), yet (2), again (2), sleep (2), playroom (2), guest (2), big (2), built (2), shelves (2), both (2), try (2), decide (2), wait (2), found (2), thursday (2), etc (2), his (2), crap (2), behind (2), god (2), season (2), replaced (2), possible (2), hope (2), easter (2), theodorakis (2), greece (2), pace (2), frenzy (2), building (2), σιγα (2), shower (2), powder (2), having (2), arch (2), your (2), evidence (2), pre (2), summer (2), tell (2), willing (2), camera (2), style (2), duravit (2), plagos (2), never (2), use (2), until (2), athens (2), crete (2), marble (2), tiles (2), another (2), row (2), easy (2), border (2), 0px (2), cool (2), chose (2), basically (2), kept (2), wooden (2), massive (2), delay (2), most (2), coming (2), lighting (2), totally (2), opa (2), 911 (2), simple, theme, powered, blogger, followers, december, 2008, 2009, 2010, archive, contributors, anticraft, adventures, filthy, fluno, learn, craft, ravelry, random, acts, art, baking, three, bungalow, transformation, subscribe, atom, older, faced, reasons, recognizably, spaces, retain, formerly, underneath, ventilation, humidity, issues, flake, charm, kind, shabby, chic, ages, happy, neither, rains, yellows, reds, brick, used, coloring, agent, making, traditional, appear, little, adds, affect, course, terrible, shall, waiting, install, surprise, choice, delays, count, electricity, ask, specifics, underfloor, requires, higher, energy, draw, power, office, somewhere, rubber, stamp, paper, turn, 650, euro, service, fee, hey, strike, bits, few, testing, tested, gave, laying, above, stairs, record, tomorrow, rest, already, involved, stairwell, looking, maybe, met, claims, showing, through, pressed, him, ceiling, colours, chosen, test, patch, give, final, apprehensive, lavender, system, arrived, boy, properly, compliment, shutters, considered, tie, whole, island, benches, legs, leaf, easily, pulled, seating, entertaining, any, dish, washer, countertops, ran, hardware, picked, sturdy, metal, mechanisms, opposed, plastic, lives, females, slamming, expected, sturdier, set, lines, bar, sort, wooohooo, baseboards, step, strips, doorways, wow, seemed, turns, narrow, unfortunately, deal, bigger, slender, indiscreet, purchased, brushed, nickle, angle, makes, tricky, installation, spacer, open, original, plans, translated, worker, correctly, ahhh, huge, allow, flexibility, might, become, leaves, proved, mural, depending, probably, sleeping, chatty, kathies, hand, ones, liked, bunch, design, handy, includes, stones, niches, archways, stone, knew, cleans, themselves, either, crew, new, complete, because, extensive, throw, own, frappe, cups, wires, extra, lengths, spent, sunday, doing, clearing, boxes, sinks, toilets, junk, garden, return, grace, scaffolding, chimney, removed, improvement, plan, gate, list, musts, lily, blooms, walnut, tree, despite, neglect, plant, hanging, actuality, lost, grapevine, soon, lets, ton, fingers, crossed, inside, music, moving, snails, sometimes, thinks, nothing, happening, mistakes, happen, often, unnoticed, attends, kicked, wish, say, case, kick, mode, plumbing, tunnel, tiny, almost, glass, needs, fixed, tiled, receive, baci, bowl, problems, figure, attached, measurements, checked, wing, low, careful, turning, washing, hands, practical, joke, someone, hurt, safe, efforts, local, hotels, ready, invasion, tourists, scandinavia, tired, invisible, truth, prep, seems, painting, begin, sure, exactly, takis, past, noon, suspicions, true, 2pm, using, tips, rate, primed, railing, forgot, model, hole, store, triple, replacement, shows, sales, girl, says, why, hate, ugly, different, means, bidet, build, paid, runs, keeping, gratis, perhaps, contact, directly, distributor, carries, product, worries, chipped, weeks, fully, completed, baths, ground, brush, teethe, twice, toothpaste, combo, sticks, lastly, idea, stove, wants, stainless, avoiding, tiling, cabinets, sold, loved, splashes, hostages, picasa, padding, transparent, repeat, scroll, clip, origin, inline, policy, align, middle, peak, arched, mirror, fixture, usable, job, raspberry, ice, flat, roof, noticed, wam, winter, amount, sun, remains, coldest, soft, lavendar, generally, disaster, area, these, lamp, rice, due, gotta, keep, wanting, short, beige, khaki, feel, colors, looked, teamed, architect, custom, likes, rather, listening, owners, saying, too, yellow, sample, supposedly, lightened, trust, beams, washed, uniform, whites, always, dingy, windows, natural, pinkish, plastering, variations, sorry, blogging, moved, without, phone, internet, several, months, techy, cable, busy, jobs, mid, august, card, reader, updates, whether, finshed, nitches, dining, cleanest, amazing, everything, dusty, dirty, women, unfinshed, mopping, mis, batch, supplier, robbed, send, taking, available, teaming, plain, grey, manufacturer, eventually, minute, during, electrician, fault, outdoor, waited, budget, stretched, current, tax, needed, less, expensive, lights, later, friday, ongoing, renovation, toddler, tow, thinking,


Text of the page (random words):
rkers coming to the house the day before the move during the move and still now today 11 11 11 yes the electrician you see below is back today to finish up on the out door lighting now this delay is totally not his fault alex and i never decided on outdoor lighting and finally got it together after season ended good thing we waited as our budget was totally stretched and with the current tax changes we needed to go with some less expensive lights i will take those photos later but for now here are some photos of the finishing up process pre move below you can see the loft space and the kitchen the tiles we ordered for the back splash are only one row at this point we mis ordered easy to do apparently when we went to order another batch we found out that the supplier had been robbed in athens and had none to send down we ended up taking every available tile they had in storage and teaming them with plain grey by the same manufacturer again i will get a photo of the finished kitchen eventually the move was amazing as everything kept getting dusty and dirty even with two cleaning women coming in but what can you do when you move into an unfinshed house you basically end up mopping every day here the finshed nitches in the dining room cleanest part of the house at this point posted by jenn no comments email this blogthis share to x share to facebook share to pinterest adding color sorry for the massive delay in blogging but for those who do not know we are actually in the house now we moved in the first week of may the same week i jenn went back to work we were without a phone or internet for several months once we got that techy stuff done we could not find the cable for the camera and were also way to busy to blog as most of you know i was working 2 jobs from mid august until the end of october now i have a card reader and time so here come the updates whether you want them or not going back in time you can see the paint job first the top photo is sianna s room a raspberry ice like pink with the main white of the house sianna s room has since turned into the bedroom for both the girls they decided that they wanted to be together which is good as the other room has a flat roof and we noticed gets much more wam in the summer now that it is winter it gets the least amount of sun light and remains the coldest so what was to be olivia s room is now the playroom it is a soft lavendar with white and is generally a disaster area these days i did find a very cool lamp from rice and will get a done photo in due time gotta keep you wanting more here is our short wall in our bedroom it is a darker beige khaki color i like how it turned out but feel the same about it as i do with the other colors they all would have looked better had they been teamed with the white that i chose not the crap we ended up with basically the architect had told our painter the custom color he likes to use the painter went and got it rather then listening to the home owners who kept saying that it was too yellow i even had a paint sample of what i wanted supposedly he took it to be lightened up but trust me it is yellowish the reason i don t like it is that the exposed wooden beams were white washed and the cool tone looks crappy next to the warm tone it is not uniform also yellowish whites always look dingy to me and we have very small windows for natural light but below you can see the sink and the tile work on the wooden counter that was made for the downstairs bath this came out nice and the pinkish plastering that sianna chose looks great it has variations in color and depth to it when you look at it here is a peak from the kitchen with the arched door and the interior arch in the bathroom we still need a mirror and light fixture but it is usable i will find a photo of the faucet posted by picasa style border 0px none padding 0px background transparent none repeat scroll 0 50 moz background clip initial moz background origin initial moz background inline policy initial align middle border 0 posted by jenn no comments email this blogthis share to x share to facebook share to pinterest thursday april 21 2011 evidence hostages look there is evidence that the painters have been around but where are they yes the painters are in but they are working at a pre easter pace having put all their efforts into getting local hotels ready for the summer invasion of tourists from scandinavia they seem a bit tired and invisible to tell you the truth there was a lot of prep work to do and that seems to be done now so the actual painting can begin we are not sure exactly what time they show up as no one is willing to go to the house at 8 or 8 30 and wait but takis had been past at noon one day and they were working i decided i would also go just to see if my suspicions were true and they were they were cleaned up and gone by 2pm the same day the next day they did not even show up sianna and i could paint the house faster using q tips at this rate but they had primed the railing and at this point it is actually painted but alex forgot the camera to get a shot below is a shot of our bathroom and our hostage the sink the sink is the correct style from duravit but not the correct model it came in last november with only one hole for a faucet even though the faucet we ordered from the same store plagos is a triple every week they tell us the replacement sink will be here in 10 days and it never shows the sales girl also says why not just take that sink and we have your faucet as a single we hate the faucet as a single it is so ugly it is not even a thought and to go with a different single means that it will not match the shower or the bidet so we took the sink so that our carpenter could at least use to build the vanity and are holding it hostage they don t get it back until we get the correct one and no we have not paid for it if this runs on to a point where we will not be able to get the correct sink i am keeping the hostage gratis perhaps i will try to contact duravit directly or their distributor in athens but plagos is the only shop on crete that carries this product no worries though the girls sink came in chipped but was replaced in a weeks time so there will be a fully completed bathroom on the first floor and god willing all the baths on the ground floor though i really don t want to brush my teethe in the powder room and have to clean the marble sink in there twice a day marble and toothpaste are not a good combo it sticks lastly the tiles in the kitchen have been installed not a great shot but you get the idea the thought was that if alex gets the stove he wants he will also have a stainless back splash that goes up behind it to the hood i think we could have gone with another row but were were avoiding tiling the entire space between the counter and the cabinets i am still not sold on it but that is what it is i just could not find something i really loved back splashes are easy to change though right posted by jenn no comments email this blogthis share to x share to facebook share to pinterest monday april 18 2011 theodorakis and building just like music by theodorakis so goes much of what is done in greece things start out slowly moving at a snails pace to the point that one sometimes thinks that nothing is happening at all then faster and faster and faster it goes mistakes happen but they often go unnoticed as one attends to all the frenzy that is being kicked up around one i wish i could say that this were the case for the building of the house but the frenzy has yet to kick in we are still on σιγα σιγα slowly slowly mode but as the painters are now in the house and more of the tile and plumbing is done we do see the light at the end of the tunnel here are some bathroom photos the tiny guest bath is almost there the glass needs to be fixed for the shower and the vanity will be placed and then tiled to receive the baci bowl below is the downstairs powder room the tile and vanity have been installed but we are having some problems with the faucets the tile is a bit in the way so we need to figure out how to get them attached the best way possible this is what happens when measurements are not checked so we will wing it and hope for the best now if you think that arch looks a but low it is and yes you will have to be very careful when turning around to leave after washing your hands it is like a built it practical joke only someone could actually get hurt sianna and olivia are safe though posted by jenn no comments email this blogthis share to x share to facebook share to pinterest monday april 11 2011 inside and out some of alex s handy work includes the cleaning off of the exposed stones in the niches and archways apparently the stone workers don t actually do that part who knew but as with much i am not surprised apparently no one actually cleans up after themselves either i know you need a cleaning crew to go into a new house after construction is complete because the dust etc is just so extensive but really can t the workers throw out their own frappe cups wires and extra lengths of wood etc alex spent a good part of his sunday doing just that clearing out the crap that has been left behind boxes that sinks or toilets or faucets came in junk left out in the garden this week should see the return of the tile guy the plumber and by the grace of god the carpenter then we can get the painter in on the outside of the house you can see that the scaffolding around the chimney has finally been removed big improvement still no plan for a front gate but that is not on the list of musts to get us into the house and here is the first lily of the season that blooms under the walnut tree so despite neglect and construction at least that one plant is still hanging on in all actuality we only lost the grapevine and that will be replaced as soon as possible lets hope to get a ton of work done this week and us into the house after easter fingers crossed posted by jenn no comments email this blogthis share to x share to facebook share to pinterest thursday march 31 2011 closets in progress wow what seemed like an o k space just outside of the master bath turns out to be really narrow after the closets are installed unfortunately we need the storage space and will have to deal with it below is a shot of the closet that is in the master bedroom it looks bigger then it really is the doors will be painted the same color as the walls and some very slender and indiscreet handles have been purchased in a brushed nickle below is olivia s closet her wall is at an angle and this makes for a tricky installation we will have the carpenter move the closet over a bit and place a spacer so the last door can open better apparently it was in the original plans but was not translated to the worker correctly ahhh yet again we did not do a huge closet in olivia s room to allow for more flexibility with the space things change and the girls now want to sleep in the same room so this might become a playroom and additional guest space that leaves sianna s closet pretty big and built in shelves will proved a lot of storage space both her s and olivia s closets will be painted white and the exposed shelves are in a wood tone then i will go back and try to do a mural at some point for each of them depending on where they decide to sleep and how the rooms work out probably best to wait a bit to see if they even like sleeping in the same room or if i like it they are chatty kathies i found some hand painted handles and could not decide on which ones i liked the best so i took a bunch of each design and will mix them up in each of the rooms posted by jenn no comments email this blogthis share to x share to facebook share to pinterest doors in progress the interior doors are in wooohooo frames have gone in and the doors were all placed but taken off for the time being since a lot of work is still going on but the wood flooring guy came right over and finished up the baseboards for the entire house last step in that is going out to find the wood strips that will be in place between the tile floor and the wood and in the doorways alex and i ran to the hardware shop and picked out some sturdy door handles we opted for all metal mechanisms as opposed to plastic my thought was that he lives with 3 females the slamming of doors is to be expected the sturdier the better this last shot is of one of the doors while it was being set they really don t have those 2 lines i think those were a bar of some sort posted by jenn no comments email this blogthis share to x share to facebook share to pinterest countertops the counter tops have arrived and boy do they show the dust but once the construction is done and they are cleaned properly we think they will look great they actually compliment the window frames and shutters something we had not even considered and seem to tie the whole thing together next to the island we have had a kitchen table made with two benches white legs and tops that are the same as the counter tops the table is really great as it has a leaf that can easily be pulled out for additional seating i think we will be able to move it in and out the front door for when we are entertaining outside so we are getting there slowly now we need the carpenter to finish any bit around the kitchen so the tile guy can get in there and do the back splash time to order the hood for the range and a dish washer posted by jenn no comments email this blogthis share to x share to facebook share to pinterest monday march 21 2011 wood floors after more delays then i can count our electricity was finally changed from a 1 to a 3 don t ask me about the specifics of this all i know is that the underfloor heating requires a higher energy draw so while we had power before it has to be change to start up the heating system this took a week or so since some one in some office somewhere had to take there time to put a rubber stamp on some paper before the guys could actually go turn it over at a 650 euro service fee i would think they could be a bit faster but hey at least there was not a strike so that got changed over and the heating guys finished the last bits and turned it on with a few days of testing all was warm and tested ok that gave the ok for the flooring guys to go in and start the clean up and laying down of the wood floors above is a shot from olivia s room and out towards the stairs below is the master bedroom now you see the loft space that was done first they actually finished all of the work in a record two days the carpenter will come in and put in all the doors today and tomorrow then they will be able to do the baseboard for the rest of the rooms you can see that the baseboard is already up in the loft since there is no door involved below is a shot from the stairwell looking towards olivia s room maybe the next time a photo is taken her walls will be lavender alex met with the painter today he claim...
Thumbnail images (randomly selected): * Images may be subject to copyright.GREEN status (no comments)

Verified site has: 39 subpage(s). Do you want to verify them? Verify pages:

1-5 6-10 11-15 16-20 21-25 26-30 31-35 36-39


The site also has 31 references to other resources (not html/xhtml )

 localhost:50477/94712f8b9ad908912f78d7___.jpg  Verify  localhost:50477/94712f8b9ad908912f78d7___.jpg  Verify  localhost:50477/94712f8b9ad908912f78d7___.jpg  Verify
 localhost:50477/94712f8b9ad908912f78d7___.jpg  Verify  blogger.googleusercontent.com/img/b/R2___.jpg  Verify  blogger.googleusercontent.com/img/b/R2___.jpg  Verify
 blogger.googleusercontent.com/img/b/R2___.jpg  Verify  blogger.googleusercontent.com/img/b/R2___.jpg  Verify  blogger.googleusercontent.com/img/b/R2___.jpg  Verify
 blogger.googleusercontent.com/img/b/R2___.jpg  Verify  blogger.googleusercontent.com/img/b/R2___.jpg  Verify  blogger.googleusercontent.com/img/b/R2___.jpg  Verify
 blogger.googleusercontent.com/img/b/R2___.jpg  Verify  blogger.googleusercontent.com/img/b/R2___.jpg  Verify  blogger.googleusercontent.com/img/b/R2___.jpg  Verify
 blogger.googleusercontent.com/img/b/R2___.jpg  Verify  blogger.googleusercontent.com/img/b/R2___.jpg  Verify  localhost:64037/7c5fabd05e03f75e3c7360___.jpg  Verify
 localhost:64037/7c5fabd05e03f75e3c7360___.jpg  Verify  localhost:64037/7c5fabd05e03f75e3c7360___.jpg  Verify  localhost:64037/7c5fabd05e03f75e3c7360___.jpg  Verify
 blogger.googleusercontent.com/img/b/R2___.jpg  Verify  blogger.googleusercontent.com/img/b/R2___.jpg  Verify  blogger.googleusercontent.com/img/b/R2___.jpg  Verify
 localhost:64037/fe5044d562a4aebbbbf4ac___.jpg  Verify  localhost:64037/fe5044d562a4aebbbbf4ac___.jpg  Verify  localhost:64037/fe5044d562a4aebbbbf4ac___.jpg  Verify
 localhost:64037/60bb0a838ec71523434cb8___.jpg  Verify  localhost:64037/60bb0a838ec71523434cb8___.jpg  Verify  localhost:64037/60bb0a838ec71523434cb8___.jpg  Verify
 blogger.googleusercontent.com/img/b/R2___.jpg  Verify


Top 50 hastags from of all verified websites.

Supplementary Information (add-on for SEO geeks)*- See more on header.verify-www.com

Header

HTTP/1.1 200 OK
Content-Type text/html; charset=UTF-8
Expires Sat, 08 Aug 2026 06:51:18 GMT
Date Sat, 08 Aug 2026 06:51:18 GMT
Cache-Control private, max-age=0
Last-Modified Wed, 28 Aug 2024 07:51:54 GMT
ETag W/ 510bad101f4fd269a6e2b054d84ccd7baadb53e7a79132719791f9d893ab6596
Content-Encoding gzip
X-Content-Type-Options nosniff
X-XSS-Protection 1; mode=block
Content-Length 24942
Server GSE
Connection close

Meta Tags

title="OPA 911"
content="width=1100" name="viewport"
content="text/html; charset=UTF-8" http-equiv="Content-Type"
content="blogger" name="generator"
content="htt???/opa911.blogspot.com/" property="og:url"
content="OPA 911" property="og:title"
content="An ongoing, massive renovation of a village house in Crete, Greece, with a y.o. and a toddler in tow.... what were we thinking?" property="og:description"
name="google-adsense-platform-account" content="ca-host-pub-1556223355139109"
name="google-adsense-platform-domain" content="blogspot.com"
content="OPA 911" itemprop="name"
content="htt???/localhost:50477/94712f8b9ad908912f78d7d81dbadb38/image/353613270f4fecc3.jpg?size=320" itemprop="image_url"
content="7678994373242556015" itemprop="blogId"
content="3660848776189007530" itemprop="postId"
content="htt????/blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEipUbuHY3ZjDKhug9Baw3rhuS8QwLsjx0spzxJzRNjQGVP7tFfHfKLShIgl-iydzTAwEz96qkMUyi6T3Vo6s1lBaLxCYovo6zpTS77htQpwbhyphenhyphenfHWtgmzUX6cTSDR3fy47XjlS9zinlwiut/s320/DSC00615.jpg" itemprop="image_url"
content="7678994373242556015" itemprop="blogId"
content="2147180427639025785" itemprop="postId"
content="htt????/blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEjyqOs9rar4mfakogcwdeC_ILeE_9GYGHhe4SlCT8DsUUBzOyILLfBCWh9aDXg_yWjSskVdr0UZjGYAhHVH93bee9AWEyXTSrQeR1M7FOPKgeXYMrkqlP8UCCpIk8HlArvyFDiReMP06iS4/s200/DSC00514.jpg" itemprop="image_url"
content="7678994373242556015" itemprop="blogId"
content="5737017693439615389" itemprop="postId"
content="htt????/blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEjbK7mHHqG2DqtaH8QrSGqYj0Lc-w69dHUlhQ3JvJLFvCs_Zdvz3NmNHW4HMzocqNYUiIo28OPllauWr4cu-o4AEuziTzj62wlWTSQZMLOswEWrvkC_GeZvn4Rxu3wWq6A1a93q191iVONe/s200/DSC00489.jpg" itemprop="image_url"
content="7678994373242556015" itemprop="blogId"
content="520150606810938845" itemprop="postId"
content="htt????/blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEg4vhm3fG76sOxNRh8o04CEYFlzF7jBW74DDiImg347T-6KIiYQTPnPK2jHnkmvmKWWr7fZoc7Uz8xzbDg5CaSWzjsALzvQbT_qLbrXmwVWNgYsb7WO78sMuhi4D1U5gmWazkn40lCRiYp_/s200/DSC00427.jpg" itemprop="image_url"
content="7678994373242556015" itemprop="blogId"
content="3988857569956869689" itemprop="postId"
content="htt????/blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEi2Via9T0gjih8FqiN62lgLMQiOjRMXFnkuwCBvOLDvduWrVOU08ZZTb9cP9YqVKKGERyxyCG2Wav_yX5KaX2iY_oZ2gk0W8HmQIoivFJimip3QbNKNJjMOKuET0ZT61LFQbKIWTvV0shqf/s200/DSC00414.jpg" itemprop="image_url"
content="7678994373242556015" itemprop="blogId"
content="2092249606170473961" itemprop="postId"
content="htt????/blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEgZgd461f18UKqqZcL8yRXmpbAVQmipAvPSpsyZcvCFdScil4vIHYuoMdUibpLaP_5wR45qdMjggkx2AUlIpSqzIv0HEGXHuG6QyXaoV1klLqR3grtldtv__DVyhAhkfq1VfErXu6OAH7dE/s200/DSC00409.jpg" itemprop="image_url"
content="7678994373242556015" itemprop="blogId"
content="533366213095026627" itemprop="postId"
content="htt????/blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEipeVYkMdbWFy9XhVGNxWTN-DAXZ7uuR5_kp94lMJK-gvVvgOZ_yIQ1A9C7CRMuof9T6d1o088AMSkfuLABapIqyvf-9ih7ZDYp53_uB_A6vvBNTm5RcB-URPDSNFRGCEkAw46m1OtMq1_h/s200/DSC00334.JPG" itemprop="image_url"
content="7678994373242556015" itemprop="blogId"
content="5809460962662680425" itemprop="postId"
content="htt????/blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEj0WOpbRnGR-LYs70scoxBr3JSEcePxhs3EPCTAub_XO526jb8qvQVXHjg9m1dPCTKv6GGbugthBqbVm46TKSfHGbnb3Ms9nISiA2iif5MdWbsoPxMUxZhOprVbLtHDHrlZWW9jOrvaP9sX/s320/DSC00325.JPG" itemprop="image_url"
content="7678994373242556015" itemprop="blogId"
content="2189740773264447039" itemprop="postId"
content="htt????/blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEiyzEhHNgtrdMTX73ZMEWOK4yYbdXyTQjXmYrz46fFzgr14LuYoMwtBl-bTQtklIGAIjJBMW6Af-0mtLxccaPiIV9Kgk4-_LtYOdi2IpZ5arXZLuAuTQvqP6oK9nSxo7OuRQo40MCgTvFGH/s320/P1000335.JPG" itemprop="image_url"
content="7678994373242556015" itemprop="blogId"
content="198828286881445379" itemprop="postId"

Load Info

page size24942
load time (s)0.713693
redirect count0
speed download34981
server IP 142.251.39.193
* all occurrences of the string "http://" have been changed to "htt???/"